Production tools

The maths your factory does, done before you ask for the quote.

Six tools that work on the style’s own BOM, POMs and parts. Results land on the record with the method written next to them, so a number can always be checked. Free to run, on every plan.

Tryor bring last season’s tech pack

Patterns, nesting and yield

Pieces from a photo. Then on the roll, with fabric per unit.

Shoot the pattern pieces on a sheet of A4: the sheet sets the scale, and each piece comes back as a named, counted outline at 1:1. Nest them on your roll widths for a marker, its utilisation and the fabric each unit needs, and send that yield into the BOM.

  • Or rough pieces from the drawn body, said so
  • Exports at 1:1: DXF, SVG and PDF at 100%
  • Yield per roll width, into the BOM line

Free on every plan

Patterns from a photo

Talus 22L Daypack

5pieces

Largest 421 × 262 mm, ±2 mm

DXFSVGPDF at 100%

Nesting and yield

Talus 22L Daypack

0.226yd / unit

87% utilisation on a 58 in roll

Should-cost

What it ought to cost, and where to push first.

Materials from the BOM, labour by operation, overhead and margin give a likely FOB range to hold a factory’s quote against. Change any assumption and the figures follow at once; the gap is broken down so you know which line to question.

Free on every plan

Should-cost

Talus 22L Daypack

14.90–16.10USD

Likely FOB · Hengfeng’s R2 at 15.77 sits inside

Materials
BOM × consumption × price
Labour
operations × minutes × rate
Overhead and margin
your assumptions

Cpk on sample builds

Which POMs are off target, and which just spread.

Send the factory the sheet, take their readings back, and see each POM’s Cpk, worst first, with what kind of problem it is and what to change. Readings land on the style’s sample round; compare a round against an earlier one.

Free on every plan

Cpk · engineering build

Talus 22L Daypack
  • ABody heightCpk1.42
  • JStrap lengthCpk1.12
  • PPocket depthCpk0.87

Line instructions

Line cards for the floor, in the factory’s language.

An operation sequence and one card per step, read off the drawn tech pack, with what went wrong at the last build in red. Print them for the line, or translate them into Chinese or Vietnamese.

Free on every plan3 credits to translate · priced before it runs

Line instructions

Talus 22L Daypack

24operations

Line cards for the floor · 3 credits to translate

English中文Tiếng Việt

Strap and handle strength

Which stitch lets go first in a snag.

For straps, handles and their attachments: each one against the snags it meets in use, which part lets go first, and the lab jerk test to ask for. An estimate, said so, to confirm with a pull test.

Free on every plan

Strap and handle strength

Talus 22L Daypack

~610N

Bar-tack at the strap anchor fails first

Estimate · confirm with a lab pull test

Production tools · questions

Questions

Are the tools really free?
Yes, on every plan: they are arithmetic on your own numbers, not AI. Only translating line cards uses credits.
Where do the inputs come from?
The style’s BOM, POMs, parts and drawn pack. Nothing is retyped; change the record and the tools follow.
Can my factory use the results?
Markers export as DXF, SVG and PDF at 100%; line cards print for the floor; Cpk sheets go to the factory and come back with readings.

Yes, on every plan: they are arithmetic on your own numbers, not AI. Only translating line cards uses credits.